Satisfaction-driven bi-objective multi-skill workforce scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A bi-objective algorithm for a reactive multi-skill project scheduling problem

The aim of this paper is to present project scheduling problem met in a an industrial context. The focus is mainly to the reactive model. In fact, the predictive case was studied in previous works, and this paper presents a solution for a reactive version of the model studied before. We proposed a linear mathematical model for the problem and then we show that this model cannot be used in pract...

متن کامل

Attaining stability in multi-skill workforce scheduling

In this paper, we define a set inequalities that are satisfied by stable multi-skill workforce schedules. In our analysis, a schedule is said to be stable if it does not contain a blocking pair, extending the notion of blocking pair in the Marriage Model of Gale-Shapley. Skill efficiency is chosen as the criterion in the preference structure. The proposed algorithm either constructs a stable mu...

متن کامل

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

متن کامل

Using Multi-Objective Particle Swarm Optimization for Bi-objective Multi-Mode Resource-Constrained Project Scheduling Problem

In this paper the multi-mode resource-constrained project scheduling problem with discounted cash flows is considered. Minimizing the makespan and maximization the net present value (NPV) are the two common objectives that have been investigated in the literature. We apply one evolutionary algorithm named multiobjective particle swarm optimization (MOPSO) to find Pareto front solutions. We used...

متن کامل

Bi-objective workforce-constrained maintenance scheduling: a case study

In this paper, a real maintenance workforce-constrained scheduling problem is formulated as a bi-objective mixed-integer programming model with the aim of simultaneously minimizing the workforce requirements and maximizing the equipment availability. The skilled workforce is provided by internal and external resources using regular time, overtime and contracting. The equipment availability is m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.11.134