Scheduling a Flexible, Open-Architecture Robotic Workstation Under LabWindows
نویسندگان
چکیده
منابع مشابه
Flexible job shop scheduling under availability constraints
In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...
متن کاملflexible job shop scheduling under availability constraints
in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...
متن کاملScheduling in a three-machine robotic flexible manufacturing cell
In this study, we consider a flexible manufacturing cell (FMC) processing identical parts on which the loading and unloading of machines are made by a robot. The machines used in FMCs are predominantly CNC machines and these machines are flexible enough for performing several operations provided that the required tools are stored in their tool magazines. Traditional research in this area consid...
متن کاملHierarchical Scheduling of Robotic AssemblyOperations in a Flexible Manufacturing
An approach to hierarchical scheduling for assembly in a fully automated exible manufacturing system is presented. The three-level production system consists of a master production plan, which incorporates new customer requests and makes long-term production guarantees; a production ow level, which plans and monitors the ow of subassemblies among workstations; and a scheduler level, which seque...
متن کاملCoordinated Thread Scheduling for Workstation Clusters Under Windows NT
Coordinated thread scheduling is a critical factor in achieving good performance for tightly-coupled parallel jobs on workstation clusters. We are building a coordinated scheduling system that coexists with the Windows NT scheduler which both provides coordinated scheduling and can generalize to provide a wide range of resource abstractions. We describe the basic approach, called “demand-based ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Association for Laboratory Automation
سال: 2005
ISSN: 1535-5535
DOI: 10.1016/j.jala.2005.03.001