Scheduling a forge with due dates and die deterioration

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling Trains and Containers with Due Dates and Dynamic Arrivals

We consider the problem of scheduling trains and containers (or trucks and pallets) between a depot and a destination. Goods arrive at the depot dynamically over time and have distinct due dates at the destination. There is a fixed-charge transportation cost for each vehicle, and each vehicle has the same capacity. The cost of holding goods may differ between the depot and the destination. The ...

متن کامل

Preemptive Scheduling with Variable Profile, Precedence Constraints and Due Dates

This paper is concerned with the problem of scheduling preemptive tasks subject to precedence constraints in order to minimize the maximum lateness and the makespan. The number of available parallel processors is allowed to vary in time. It is shown that when an Earliest Due Date rst algorithm provides an optimal nonpreemptive schedule for unit-execution-time (UET) tasks, then the preemptive pr...

متن کامل

Single Machine Scheduling with Distinct Due Dates under Fuzzy Environment

Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total pen...

متن کامل

Single-machine scheduling with release dates, due dates and family setup times

We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers’ satis...

متن کامل

Dynamic scheduling of multiproduct pipelines with multiple delivery due dates

Scheduling product batches in pipelines is a very complex task with many constraints to be considered. Several papers have been published on the ubject during the last decade. Most of them are based on large-size MILP discrete time scheduling models whose computational efficiency greatly iminishes for rather long time horizons. Recently, an MILP continuous problem representation in both time an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Annals of Operations Research

سال: 2019

ISSN: 0254-5330,1572-9338

DOI: 10.1007/s10479-019-03336-6