Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approaches

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

Scheduling Twin Yard Cranes in a Container Block

Full terms and conditions of use: http://pubsonline.informs.org/page/terms-and-conditions This article may be used only for the purposes of research, teaching, and/or private study. Commercial use or systematic downloading (by robots or other automatic processes) is prohibited without explicit Publisher approval, unless otherwise noted. For more information, contact [email protected]. The...

متن کامل

The optimal number of yard cranes in container terminal

The aim of this study is to propose a new mixed integer linear programming (MILP) model to find the minimum required number of yard cranes, Rubber tyred gantry cranes (RTGCs), for completion the total amount of works at the end of planning horizon. In other word, we find the optimal number of yard cranes in a container terminal which completes the total amount of works. The paper supports the p...

متن کامل

Scheduling vessels and container-yard operations with conflicting objectives

__________________________________________________________ We consider the problem of coordinating the operations of two supply chain partners: a foreign shipping company and a domestic port. The two partners have conflicting business objectives, and the issue is to determine the optimal cycle time, by which the shipping company removes the empty containers from the domestic port, so that the j...

متن کامل

Multi-agent Simulation of Sawmill Yard Operations

This paper reports the findings of using multi-agent based simulation model to evaluate the sawmill yard operations within a large privately owned sawmill in Sweden, Bergkvist Insjön AB in the current case. Conventional working routines within sawmill yard threaten the overall efficiency and thereby limit the profit margin of sawmill. Deploying dynamic work routines within the sawmill yard is n...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advanced Engineering Informatics

سال: 2021

ISSN: 1474-0346

DOI: 10.1016/j.aei.2021.101292