Scheduling of flexible flow lines in an automobile assembly plant
نویسندگان
چکیده
منابع مشابه
The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملmodelling and scheduling lot streaming flexible flow lines
although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. this paper deals with scheduling jobs in lot streaming flexible flow line problems. the paper mathematically formulates the problem by a mixed integer linear programming model. this model solves small instances to optimality. moreo...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 1997
ISSN: 0377-2217
DOI: 10.1016/s0377-2217(96)00203-2