Scheduling stochastic two-machine flow shop problems to minimize expected makespan

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Scheduling of a hub reentrant job shop to minimize makespan

This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. W...

متن کامل

A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem

This paper deals with the permutation flow shop scheduling problem. The objective is to minimize the maximum completion time, or makespan. To solve this problem which has been proved to be strongly NP-hard, a combination between an ant colony algorithm, a heuristic algorithm and a local search procedure is proposed and presented. The hybrid approach is to use artificial ants to construct soluti...

متن کامل

Inverse scheduling: two-machine flow-shop problem

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Decision Science Letters

سال: 2013

ISSN: 1929-5804,1929-5812

DOI: 10.5267/j.dsl.2013.04.005