Scheduling to Minimize Total Weighted Completion Time via Time-Indexed Linear Programming Relaxations

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Customer Order Scheduling to Minimize Total Weighted Completion Time

In this paper we study the scheduling problem in which each customer order consists of several jobs of different types, which are to be processed on m facilities. Each facility is dedicated to the processing of only one type of jobs. All jobs of an order have to be delivered to the customer at the same time. The objective is to schedule all the orders to minimize the total weighted order comple...

متن کامل

Scheduling with Rejection to Minimize the Total Weighted Completion Time∗

In this paper, we address the scheduling problem with rejection in which we can choose a subset of jobs to process. Choosing not to process any job incurs a corresponding penalty. We consider the following problem for the first time: scheduling with rejection to minimize the total weighted completion time with the constraint of total penalties on identical parallel machines, where the number of...

متن کامل

Scheduling of Two Parallel Machines with Linear Decreasing Time Slot Costs to Minimize Total Weighted Completion Time

We consider a scheduling problem with two parallel machines to minimize the sum of total weighted completion time and total machine time slot cost. In this paper we focus on the case of the constant or linear decreasing sequences of time slot costs. We suggest an exact pseudopolynomial DP algorithm for the case of arbitrary integer processing times of jobs. If all jobs have unit processing time...

متن کامل

NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time

Baker and Nuttle [1] studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. We show in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: SIAM Journal on Computing

سال: 2020

ISSN: 0097-5397,1095-7111

DOI: 10.1137/17m1156332