Permutation Flowshop Scheduling with Earliness and Tardiness Penalties

The main objective of the working paper series of the IIMA is to help faculty members to test out their research findings at the pre-publication stage. Abstract We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are...

متن کامل

Machine scheduling with earliness, tardiness and non-execution penalties

The study of scheduling problems with earliness–tardiness (E/T) penalties is motivated by the just-in-time (JIT) philosophy, which supports the notion that earliness, as well as tardiness, should be discouraged. In this work, we consider several scheduling problems. We begin by generalizing a known polynomial time algorithm that calculates an optimal schedule for a given sequence of tasks, on a...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties

Nowadays, flexible manufacturing system (FMS) is introduced as a response to the competitive environment. Scheduling of FMS is more complex and more difficult than the other scheduling production systems. One of the main factors in scheduling of FMS is variable time of taking orders from customers, which leads to a sudden change in the manufacturing process. Also, some problems are created in p...

متن کامل

A branch-and-bound algorithm for single machine scheduling with quadratic earliness and tardiness penalties

This paper considers the problem of scheduling a single machine, in which the objective function is to minimize the weighted quadratic earliness and tardiness penalties and no machine idle time is allowed. We develop a branch and bound algorithm involving the implementation of lower and upper bounding procedures as well as some dominance rules. The lower bound is designed based on a lagrangian ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Naval Research Logistics

سال: 1992

ISSN: 0894-069X,1520-6750

DOI: 10.1002/1520-6750(199203)39:2<229::aid-nav3220390207>3.0.co;2-z