Second-order conic programming model for load restoration considering uncertainty of load increment based on information gap decision theory

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Remaining Fatigue Life Predictions Considering Load and Model Parameters Uncertainty

Fatigue-driven damage propagation is one of the most unpredictable failure mechanisms for a large variety of mechanical and structural systems subjected to cyclic and/or random operational loads during their service life. Therefore, monitoring the critical components of these systems, assessing their structural integrity, recursively predicting their remaining fatigue life (RFL), and providing ...

متن کامل

Probabilistic Load Flow Considering Wind Generation Uncertainty

Renewable energy sources, such as wind, solar and hydro, are increasingly incorporated into power grids, as a direct consequence of energy and environmental issues. These types of energies are variable and intermittent by nature and their exploitation introduces uncertainties into the power grid. Therefore, probabilistic analysis of the system performance is of significant interest. This paper ...

متن کامل

Linear discrimination using second order conic programming

We propose a new p-norm linear discrimination model that generalizes the model of Bennett and Mangasarian (1992) and reduces to linear programming problem with p-order conic constraints. We demonstrate that the developed model possesses excellent methodological and computational properties (e.g., it does not allow for a null separating hyperplane when the sets are linearly separable, etc). The ...

متن کامل

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

متن کامل

Distributed Generation Expansion Planning Considering Load Growth Uncertainty: A Novel Multi-Period Stochastic Model

Abstract – Distributed generation (DG) technology is known as an efficient solution for applying in distribution system planning (DSP) problems. Load growth uncertainty associated with distribution network is a significant source of uncertainty which highly affects optimal management of DGs. In order to handle this problem, a novel model is proposed in this paper based on DG solution, consideri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Electrical Power & Energy Systems

سال: 2019

ISSN: 0142-0615

DOI: 10.1016/j.ijepes.2018.08.018