Seepage Exploration on a Landslide in a Hydroelectric Power Station
نویسندگان
چکیده
Landslide stability analysis is the basement of landslide research. To study influence water on reservoir stability, taking a for example in hydroelectric power station based detailed field investigation and operation data, geological conditions, rainfall were considered, slope failure pattern under natural state rain simulated with Mohr-Coulomb criterion after an numerical three-dimensional model established by fast Lagrange continua 3-dunebsion. A simulation was made sliding direction limit equilibrium situation. The change laws analyzed self-gravity, fluctuation. distribution characteristics plastic deformation, displacement potential surface inside intuitively showed different conditions. From point instability mechanism, one important factors inducing instability. key block suddenly broken shear rupture that triggers landslide. It offers reliable basis both prediction second induced disaster prevention.
منابع مشابه
a study on rate making and required reserves determination in reinsurance market: a simulation
reinsurance is widely recognized as an important instrument in the capital management of an insurance company as well as its risk management tool. this thesis is intended to determine premium rates for different types of reinsurance policies. also, given the fact that the reinsurance coverage of every company depends upon its reserves, so different types of reserves and the method of their calc...
Characterization of the Water Quality Status on a Stretch of River Lérez around a Small Hydroelectric Power Station
The renewable energy emerged as a solution to the environmental problems caused by the conventional sources of energy. Small hydropower (SHP) is claimed to cause negligible effects on the ecosystem, although some environmental values are threatened and maintenance of an adequate water quality should be ensured. This work provides a characterization of the water quality status in a river stretch...
متن کاملTicks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.
From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in transdisciplinary engineering
سال: 2022
ISSN: ['2352-751X', '2352-7528']
DOI: https://doi.org/10.3233/atde220950