SEMI-ON-LINE PARALLEL MACHINES SCHEDULING UNDER KNOWN TOTAL AND LARGEST PROCESSING TIMES

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Semi-on-line Parallel Machines Scheduling under Known Total and Largest Processing Times

We consider the semi-on-line parallel machines scheduling problem with the known total and the largest processing times of all jobs. We develop an approximation algorithm for the problem and prove that the competitive ratio of the algorithm is not more than √ 10 3 ≈ 1.8257, regardless of the number of machines.

متن کامل

Semi-online scheduling on 2 machines under a grade of service provision with bounded processing times

We study the problem of semi-online scheduling on 2 machines under a grade of service (GoS). GoS means that some jobs have to be processed by some machines to be guaranteed a high quality. The problem is online in the sense that jobs are presented one by one, and each job shall be assigned to a time slot on its arrival. Assume that the processing time pi of every job Ji is bounded by an interva...

متن کامل

Semi-on-line multiprocessor scheduling with given total processing time

We are given a set of identical machines and a sequence of jobs, the sum of whose weights is known in advance. The jobs are to be assigned on-line to one of the machines and the objective is to minimize the makespan. An algorithm with performance ratio 1.6 and a lower bound of 1.5 is presented. These results improve on the recent results by Azar and Regev, who proposed an algorithm with perform...

متن کامل

Bi-criteria Scheduling on Parallel Machines Under Fuzzy Processing Time

Job scheduling is concerned with the optimal allocation of scare resources with objective of optimising one or several criteria. Job scheduling has been a fruitful area of research for many decades in which scheduling resolve both allocation of machines and order of processing. If the jobs are scheduled properly, not only the time is saved but also efficiency of system is increased. The paralle...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operations Research Society of Japan

سال: 2005

ISSN: 0453-4514,2188-8299

DOI: 10.15807/jorsj.48.1