Semi-online machine covering for two uniform machines
نویسندگان
چکیده
منابع مشابه
Semi-online machine covering for two uniform machines
The machine covering problem deals with partitioning a sequence of jobs among a set of machines, so as to maximize the completion time of the least loaded machine. We study a semi-online variant, where jobs arrive one by one, sorted by non-increasing size. The jobs are to be processed by two uniformly related machines, with a speed ratio of q ≥ 1. Each job has to be processed continuously, in a...
متن کاملTwo semi-online scheduling problems on two uniform machines
This paper considers two semi-online scheduling problems, one with known optimal value and the other with known total sum, on two uniform machines with a machine speed ratio of s ≥ 1. For the first problem, we provide an optimal algorithm for s ∈ [ 1+ √
متن کاملOptimal semi-online algorithms for machine covering
This paper investigates the semi-online machine covering problems on m ≥ 3 parallel identical machines. Three different semi-online versions are studied and optimal algorithms are proposed. We prove that if the total processing time of all jobs or the largest processing time of all jobs is known in advance, the competitive ratios of the optimal algorithms are both m − 1. If the total processing...
متن کاملA Note on Semi-online Machine Covering
In the machine cover problem we are given m machines and n jobs to be assigned (scheduled) so that the smallest load of a machine is as large as possible. A semi-online algorithm is given in advance the optimal value of the smallest load for the given instance, and then the jobs are scheduled one by one as they arrive, without any knowledge of the following jobs. We present a deterministic algo...
متن کاملTight upper bounds for semi-online scheduling on two uniform machines with known optimum
We consider a semi-online version of the problem of scheduling a sequence of jobs of different lengths on two uniform machines with given speeds 1 and s. Jobs are revealed one by one (the assignment of a job has to be done before the next job is revealed), and the objective is to minimize the makespan. In the considered variant the optimal offline makespan is known in advance. The most studied ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Theoretical Computer Science
سال: 2009
ISSN: 0304-3975
DOI: 10.1016/j.tcs.2009.08.001