Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Genetic and Memetic Algorithms for Sequencing a New JIT Mixed-Model Assembly Line

This paper presents a new mathematical programming model for the bi-criteria mixed-model assembly line balancing problem in a just-in-time (JIT) production system. There is a set of criteria to judge sequences of the product mix in terms of the effective utilization of the system. The primary goal of this model is to minimize the setup cost and the stoppage assembly line cost, simultaneously. B...

متن کامل

JIT sequencing for mixed-model assembly lines with setups using Tabu Search

This research presents a heuristic for sequencing mixed-model production schedules for assembly lines when JIT production is an objective, and setup requirements are present. The heuristic examines a sequence and determines an objective function value based upon the parts usage rate (Miltenburg 1989) and the number of setups involved. This sequence is then altered in the hope of ® nding a bette...

متن کامل

Sequencing mixed-model assembly lines: Survey, classification and model critique

Manufacturers in a wide range of industries nowadays face the challenge of providing a rich product variety at very low cost. This typically requires the implementation of cost efficient, flexible production systems. Often, so called mixed-model assembly lines are employed, where setup operations are reduced to such an extent that various models of a common base product can be manufactured in i...

متن کامل

Genetic and Memetic Algorithms for Sequencing a New JIT Mixed-Model Assembly Line

This paper presents a new mathematical programming model for the bi-criteria mixed-model assembly line balancing problem in a just-in-time (JIT) production system. There is a set of criteria to judge sequences of the product mix in terms of the effective utilization of the system. The primary goal of this model is to minimize the setup cost and the stoppage assembly line cost, simultaneously. B...

متن کامل

Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines

In recent years, more and more automobile producers adopted the supermarketconcept to enable a exible and reliable Just-in-Time (JIT) part supply of their mixed-model assembly lines. Within this concept, a supermarket is a decentralized in-house logistics area where parts are intermediately stored and then loaded on small tow trains. These tow trains travel across the shop oor on speci c routes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Management Science

سال: 2001

ISSN: 0025-1909,1526-5501

DOI: 10.1287/mnsc.47.3.480.9777