Sheet-Metal Shop Scheduling Considering Makespan and Flow Time Criteria

Sheet-metal parts typically follow a unidirectional flow in the sheet-metal shop. In the first cutting stage, a large sheet is cut to different unfolded parts with a laser cutting machine. To avoid waste material different parts are combined on a sheet. Next, the 2D parts are transformed to 3D products with air bending. In this bending stage, timeconsuming set-ups between production layouts are...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

Sequencing and scheduling in the sheet metal shop

1.1 History Sheet metal operations have been in existence since 8000 B.C. (Fries-Knoblach, 1999). Due to its long history, sheet metalworking is, unfortunately, often seen as archaic and uninteresting. That metal sheets can be transformed with the aid of robust machines into fancy consumer products with tight tolerances is inconceivable to many. Yet, sheet metal operations are used for producin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Open Operational Research Journal

سال: 2010

ISSN: 1874-2432

DOI: 10.2174/1874243201004010012