Shift scheduling solution with hybrid approach in a power plant
نویسندگان
چکیده
منابع مشابه
A Hybrid MIP/CP Approach for Multi-activity Shift Scheduling
We propose a hybrid MIP/CP approach for solving multiactivity shift scheduling problems, based on regular languages that partially describe the set of feasible shifts. We use an aggregated MIP relaxation to capture the optimization part of the problem and to get rid of symmetry. Whenever the MIP solver generates a integer solution, we use a CP solver to check whether it can be turned into a fea...
متن کاملCoordinated resource scheduling in a large scale virtual power plant considering demand response and energy storages
Virtual power plant (VPP) is an effective approach to aggregate distributed generation resources under a central control. This paper introduces a mixed-integer linear programming model for optimal scheduling of the internal resources of a large scale VPP in order to maximize its profit. The proposed model studies the effect of a demand response (DR) program on the scheduling of the VPP. The pro...
متن کاملSolution approaches to large shift scheduling problems
This paper considers large shift scheduling problems with different shift start times and lengths, fractionable breaks and work stretch duration restrictions. Two solution approaches are proposed to solve the problems over a multiple-day planning horizon. The first approach is based on a local branching strategy and the second one is based on a temporal decomposition of the problem. Local branc...
متن کاملMulti-objective Solution Approaches for Employee Shift Scheduling Problems in Service Sectors (RESEARCH NOTE)
Today, workforce scheduling programs are being implemented in many production and service centers. These sectors can provide better quality products and/or services to their customers, taking into account employees’ desires and preferences in order to increase sector productivity. In this study, an employee shift scheduling problem in the service sector is discussed. In the problem, the aim is ...
متن کاملA Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Alexandria Engineering Journal
سال: 2021
ISSN: 1110-0168
DOI: 10.1016/j.aej.2021.03.076