Short-term Hydrothermal Generation Scheduling Using a Parallelized Stochastic Mixed-integer Linear Programming Algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

متن کامل

Short-Term Hydrothermal Generation Scheduling Model Using a Genetic Algorithm

A new model to deal with the short-term generation scheduling problem for hydrothermal systems is proposed. Using genetic algorithms (GAs), the model handles simultaneously the subproblems of short-term hydrothermal coordination, unit commitment, and economic load dispatch. Considering a scheduling horizon period of a week, hourly generation schedules are obtained for each of both hydro and the...

متن کامل

Short-Term Hydrothermal Generation Scheduling Model Using a Genetic Algorithm

A new model to deal with the short-term generation scheduling problem for hydrothermal systems is proposed. Using genetic algorithms (GAs), the model handles simultaneously the subproblems of short-term hydrothermal coordination, unit commitment, and economic load dispatch. Considering a scheduling horizon period of a week, hourly generation schedules are obtained for each of both hydro and the...

متن کامل

Repetitive construction processes scheduling using mixed-integer linear programming

Many construction projects contain several identical or similar units, such as floors in multistory buildings, houses in housing developments, sections of pipelines or highways. Repetitive processes arise from the subdivision of a generalized construction process into specific activities associated with particular units. In many cases it is possible to perform individual processes (repeated in ...

متن کامل

Solving the Installation Scheduling Problem Using Mixed Integer Linear Programming

for installing a large number of sizes and types of items (e.g., machines) over time so as to optimize some measure (e.g., initial capital investment), subject to various resource constraints. Examples of this problem are scheduling the installation of point-of-sale terminals in supermarket and retail chains, and teller terminals in banks. We have formulated the installation scheduling problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy Procedia

سال: 2016

ISSN: 1876-6102

DOI: 10.1016/j.egypro.2015.12.360