Simple assembly line balancing problem of Type 1 with grey demand and grey task durations
نویسندگان
چکیده
منابع مشابه
Simple Assembly Line Balancing Problem ( SALBP ) , Type 2
SALBP is an NP-hard problem. There are some measures proposed to grasp the difficulty of SALBP. Order Strength, Flexibility Ratio and West Ratio all of which are based on SALBP precedence networks are among them. This study investigates the sensitivity of difficulty of SALBP type 2 to the three measures. A SALBP solver is created in Python programming language. Computational experiments are con...
متن کاملgenetic algorithms for assembly line balancing problem
there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...
متن کاملAssembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations
This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...
متن کاملAssembly line balancing to minimize balancing loss and system loss
Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...
متن کاملReplacement Problem with Grey Parameters
Capital cost, resale value and running cost including maintenance costs, repairing costs, and operation costs of equipment are considered as crisp numbers in ordinary replacement problem. Nevertheless, in a special situation such as operating military equipments during wartime, the working efficiency of the machine and its related costs are no longer crisp but uncertain. This uncertainty can be...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Grey Systems: Theory and Application
سال: 2019
ISSN: 2043-9377
DOI: 10.1108/gs-05-2019-0011