Simulating Schedule Optimization Problem in Steelmaking Continuous Casting Process

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulating Schedule Optimization Problem in Steelmaking Continuous Casting Process

This paper establishes the models of the steelmaking continuous casting (SCC) process, and proposed the improved algorithms for this problem. The simulation results of a computerized scheduling system are also given to prove the model. The SCC process scheduling problem is very difficult to get a good performance solution in practice. The scheduling of the SCC process requires that each cast pl...

متن کامل

Steelmaking and Casting

Thin slab casting and rolling was originally developed as a low cost alternative to a conventional casting and rolling process route. However, due to the technological restrictions of the first generation plants, only limited quality and productivity goals could be achieved, questioning its further application to more advanced applications. This paper describes the original contributions that D...

متن کامل

A mathematical programming model for scheduling steelmaking-continuous casting production

This paper presents a mathematical model, based on the just-in-time (JIT) idea, for solving machine con ̄icts in steelmaking-continuous casting (SCC) production scheduling in the computer integrated manufacturing system (CIMS) environment. The model is developed as a non-linear model based on actual production situations, considering both punctual delivery and production operation continuity. It...

متن کامل

Thermal Simulation of Solidification Process in Continuous Casting

In this study, a mathematical model is introduced to simulate the coupled heat transfer equation and Stefan condition occurring in moving boundary problems such as the solidification process in the continuous casting machines. In the continuous casting process, there exists a two-phase Stefan problem with moving boundary. The control-volume finite difference approach together with the boundary ...

متن کامل

A Hybrid Modeling for Continuous Casting Scheduling Problem

This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Simulation Modelling

سال: 2015

ISSN: 1726-4529

DOI: 10.2507/ijsimm14(4)co17