Simultaneous Ensemble Postprocessing for Multiple Lead Times with Standardized Anomalies

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Determining Optimal Number of Suppliers in a Multiple Sourcing Model under Stochastic Lead Times

Employing more than one supplier and splitting orders between them is a strategy employed in supply chains to lessen the lead-time risk in unstable environments. In this paper we present a multiple-sourcing inventory system with stochastic lead-times and constant demand controlled by a continuous review, reorder point-order quantity inventory policy. We consider the situation in which the order...

متن کامل

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shortage ...

متن کامل

Optimal ordering policies with convertible lead times

A firm receives orders that will be required at an uncertain time given by an Erlang distribution, and over time observes the associated independent exponential events. The firm, in turn, places orders at a linear cost from a supplier with fixed lead time l and has the option of converting (expediting) each order, at a cost, over a certain time interval after the order is originally placed. A c...

متن کامل

Scheduling with a due-window for acceptable lead-times

Due-dates are often determined during sales negotiations between customers and the sales team of the firm. In the preliminary (pre-sale) stage, the customer provides a time interval (due-window) of his preferred due-dates. This interval reflects acceptable leadtimes, which are functions of the customer resource constraints (e.g. storage or personnel limitations). If the due-dates are assigned e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Monthly Weather Review

سال: 2017

ISSN: 0027-0644,1520-0493

DOI: 10.1175/mwr-d-16-0413.1