Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

A Multi-Vendor Single-Buyer Integrated Inventory Model with Shortages

This paper develops a more general production-inventory model for a one-buyermulti-vendor integrated system. We consider the problems where a manufacturer faces problem from the supply side when sourcing a product from heterogeneous suppliers. The model is extended to the situation with shortage permitted, based on shortage being allowed to occur only for the buyer. A numerical example and sens...

متن کامل

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

Integrated single vendor single buyer model with stochastic demand and variable lead time

In this paper, we consider the single vendor single buyer integrated production inventory problem. We relax the assumption of deterministic demand and assume that the lead time is varying lineraly with the lot size. The lead time is composed of a lot size-dependent run time and constant delay times such as moving, waiting and setup times. A solution procedure is suggested for solving the propos...

متن کامل

Energy Implications in the Single-Vendor Single-Buyer Integrated Production Inventory Model

Increasing energy efficiency is one of the main objectives of the Directive 2009/28/EC of the European Commission (called 20-20-20), which aims at decreasing greenhouse gas emissions by jointly increasing the use of renewable energy and improving energy efficiency, all by 20% until 2020. To reduce energy consumption in producing and distributing products, it is of major importance to consider e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2013

ISSN: 0307-904X

DOI: 10.1016/j.apm.2012.04.042