Slack due window assignment scheduling in the single-machine with controllable processing times

نویسندگان

چکیده

This article addresses resource allocation scheduling problems with slack due window on a single machine. Linear and convex are considered. Our goal is to determine the optimal schedule, window, allocation, minimizing various objective functions respect criteria (position-dependent weights number of early jobs, tardy starting time, size) consumption function. For linear problem, we study two cases where compression ration related job position respectively, provide lower bound jobs an upper jobs. bi-criteria analysis cost. Polynomial time algorithms developed for these problems.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Due-Window Assignment Scheduling with Variable Job Processing Times

We consider a common due-window assignment scheduling problem jobs with variable job processing times on a single machine, where the processing time of a job is a function of its position in a sequence (i.e., learning effect) or its starting time (i.e., deteriorating effect). The problem is to determine the optimal due-windows, and the processing sequence simultaneously to minimize a cost funct...

متن کامل

Single Machine Scheduling with Controllable Processing Times by submodular Optimization

In scheduling with controllable processing times the actual processing time of each job is to be chosen from the interval between the smallest (compressed or fully crashed) value and the largest (decompressed or uncrashed) value. In the problems under consideration, the jobs are processed on a single machine and the quality of a schedule is measured by two functions: the maximum cost (that depe...

متن کامل

Single-machine scheduling with time window-dependent processing times

In the one-machine scheduling problems analysed in this paper, the processing time of a job depends on the time at which the job is started. More precisely, the horizon is divided into time windows and with each one a coe cient is associated that is used to determine the actual processing time of a job starting in it. Two models are introduced, and one of them has direct connections with models...

متن کامل

The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times

We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomialtime algorithm to find the optimal job sequence, due date values and resource allocation minim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial and Management Optimization

سال: 2023

ISSN: ['1547-5816', '1553-166X']

DOI: https://doi.org/10.3934/jimo.2023067