Solar panels output optimization using Phase Change Material (PCM) and heatsink applied in open-pit mining

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

Experimental investigation on the effect of phase change materils (PCM) in solar compression refrigeration cycle efficiency

Saving energy is one of the most important challenges of todaychr('39')s world. Reducing electrical energy consumption in compressed air systems is one of the essential requirements for designing these systems. When using domestic air conditioners (dual air conditioners) in very hot areas (Khuzestan) their performance decreases and electric current consumption increases. Therefore, the use of n...

متن کامل

Mathematical Optimization Models and Methods for Open-Pit Mining

Amankwah, H. (2011). Mathematical Optimization Models and Methods for Open-Pit Mining. Doctoral dissertation. ISBN 978-91-7393-073-4. ISSN 0345-7524. Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained in them, and in this process a deeper and deeper pit is formed until the mining operation ends. Mining is often a highly complex industrial operat...

متن کامل

A Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine

One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...

متن کامل

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2021

ISSN: 1757-8981,1757-899X

DOI: 10.1088/1757-899x/1073/1/012041