SOLVED m- MACHINES, n- JOB FLOW SHOP SEQUENCING PROBLEM USING A HEURISTIC ALGORITHM

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

a fuzzy algorithm for the m-machine, n-job flow shop sequencing problem

flow shop sequencing problem is included in np-hard problems and a number of heuristic methods have been developed to solve it. most of these methods are offered for the crisp processing time. however fuzzy algorithm is appropriate for the problems with fuzzy processing time. this paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

FLOW SHOP SCHEDULING ALGORITHM TO MINIMIZE COMPLETION TIME FOR -JOBS -MACHINES PROBLEM n m

In a shop floor of the industry, the routings which are based upon the jobs that need to be processed on different machines are one among the major activities and therefore the resource requirements are not based upon the quantity as in a flow shop but rather the routings for the products being produced. However, both job shop and flow shop production cope with a scheduling problem to find a fe...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Volume 4 Issue 2 (2018)

سال: 2018

ISSN: 2394-9368,2454-2962

DOI: 10.31511/eapjmer.2018.v04i02003