Solving a wind turbine maintenance scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a wind turbine maintenance scheduling problem

Driven by climate change mitigation efforts, wind energy has significantly increased in recent years. In this context, it is essential to make its exploitation costeffective. Maintenance of wind turbines therefore playsan essential role reducing breakdowns and ensuring high productivity levels. In this paper we discuss a challenging maintenance scheduling problem rising in wind farms. While the...

متن کامل

A Branch-and-Check Approach to Solve an Onshore Wind Turbine Maintenance Scheduling Problem

In this report we deal with a maintenance scheduling problem rising in the onshore wind power industry. We address the problem on a short-term horizon considering a multi-skilled workforce. The objective is to schedule the maintenance operations in order to maximize the energy production while taking into account wind predictions, multiple task execution modes, and daily restrictions on the rou...

متن کامل

A Tool for Gas Turbine Maintenance Scheduling

We describe the implementation and deployment of a software decision support tool for the maintenance planning of gas turbines. The tool is used to plan the maintenance for turbines manufactured and maintained by Siemens Industrial Turbomachinery AB (SIT AB) with the goal to reduce the direct maintenance costs and the often very costly production losses during maintenance downtime. The optimiza...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

a heuristic algorithm for solving single machine scheduling problem with periodic maintenance

in this paper, the scheduling problem with nonresumable jobs and maintenance process is considered in order to minimize the makespan under two alternative strategies. the first strategy is to implement the maintenance process on the machine after a predetermined time period and the second one is to consider the maximum number of jobs that can be done with a special tool. we have proposed a new ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Scheduling

سال: 2017

ISSN: 1094-6136,1099-1425

DOI: 10.1007/s10951-017-0513-5