Specially Structured Three Stage Flowshop Scheduling to Minimize the Rental Cost

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...

متن کامل

Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage

The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...

متن کامل

The two stage assembly flowshop scheduling problem to minimize total tardiness

The two-stage assembly flowshop scheduling problem is addressed with the objective of minimizing total tardiness. An insertion algorithm, a genetic algorithm, and a hybrid of the insertion and genetic algorithms, are developed for the problem. Conducted computational experiments reveal that the hybrid algorithm significantly outperforms the genetic algorithm while the best performing algorithm ...

متن کامل

The three stage assembly permutation flowshop scheduling problem

The assembly flowshop scheduling problem has been studied recently due to its applicability in real life scheduling problems. It arises when various fabrication operations are performed concurrently in one stage. It was firstly introduced by Lee et al. (1993) in a flowshop environment. Later, Potts et al. (1995) considered the two-stage assembly flowshop problem with m concurrent operations in ...

متن کامل

Scheduling a variant of flowshop problems to minimize total tardiness

This paper studies no-wait flowshop scheduling problems to minimize total tardiness. This paper mathematically formulates the problem as an effective mixed integer linear programming model. Moreover, this paper proposes solution methods based on variable neighborhood search and simulated annealing algorithms. Besides, some well-known heuristics of classical flow shops are adapted to the case of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Applied Physics and Mathematics

سال: 2012

ISSN: 2010-362X

DOI: 10.7763/ijapm.2012.v2.75