Stability and Delay Analysis of EPON Registration Protocol
نویسندگان
چکیده
منابع مشابه
STABILITY ANALYSIS OF A PLANKTON SYSTEM WITH DELAY
This paper is evolved to have insight of Plankton-Nutrients interactions in the presence of delay in the growth term of phytoplankton species .The conditions for asymptotic stability about endemic equilibrium are derived in the absence of delay.The Nyquist criteria is used to estimate the length of delay to preserve stability .Analytic criterion for the existence of hopf-bifurcation is also dis...
متن کاملlangauge needs analysis of undergraduate business management and economics students
the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...
15 صفحه اولa phonological contrastive analysis of kurdish and english
deposite the different criticisms on contrastive analysis it has been proved that the results of it(when processed)can be usuful in a tefl environment,specially at the level of phonology.this study is an attempt to compare and contrast the sound systems of kurdish and english for pedagogical aims. the consonants,vowels,stress and intonation of the twolanguages are described by the same model-ta...
15 صفحه اولthe stady and analysis of rice agroclimatology in lenjan
the west of esfahan province, iran, is one of the most important agricultural areas throughout the country due to the climate variability and life-giving water of zayanderood river. rice is one of the major and economic crops in this area. the most important climatic elements in agricultural activities which should be considered include temperature, relative humidity, precipitation and wind. so...
15 صفحه اولDelay-Constrained Admission and Bandwidth Allocation for Long-Reach EPON
Next generation Passive Optical Network (PON) technology has been evolving to consolidate the metro and access networks in order to offer enhanced capacity, high split ratio and reduced deployment cost per subscriber. However, transmission of the signals to long distances up to 100km leads to increased propagation delay whereas high split ratio may lead to long cycle times resulting in large qu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Communications
سال: 2014
ISSN: 0090-6778
DOI: 10.1109/tcomm.2014.2325573