Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the effects of planning on accuracy and complexity of iranian efl students’ written narrative task performance

this study compared the different effects of form-focused guided planning vs. meaning-focused guided planning on iranian pre-intermediate students’ task performance. the study lasted for three weeks and concentrated on eight english structures. forty five pre-intermediate iranian students were randomly assigned to three groups of guided planning focus-on-form group (gpfg), guided planning focus...

15 صفحه اول

the effects of time planning and task complexity on accuracy of narrative task performance

هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...

the effects of previewing and providing background knowledge on iranian university efl learners’ comprehension of literary and academic texts

abstract poor reading comprehension can result in failure in using references, benefiting from professional gatherings and resources, keeping up with the growing body of knowledge in the virtual world of the internet, and failing to achieve in efl programs. the purpose of the present quasi-experimental study was to explore the effects of background knowledge and previewing narrative and expos...

15 صفحه اول

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

the effects of speech rate,prosodic features, and blurred speech on iranian efl learners listening comprehension

کلید واژه ها به زبان انگلیسی: effect of speech rate on listening comprehension, blurred speech,segmental and suprasegmental features,authentic speech,intelligibility, discrimination, omission, assimilation چکیده: سرعت مطالب شنیداری در کلام پیوسته بطور کلی همواره کابوسی بوده برای یادگیرنده های زبان دوم و بالاخص برای شنوندگان ایرانی. علی رغم عقل سلیم که کلام با سرعت کندتری فعالیتهای درک مطلب شن...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Construction Engineering and Project Management

سال: 2012

ISSN: 2233-9582

DOI: 10.6106/jcepm.2012.2.4.025