Stochastic assembly line balancing using beam search

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Beam-ACO Applied to Assembly Line Balancing

Assembly line balancing concerns the design of assembly lines for the manufacturing of products. In this paper we consider the time and space constrained simple assembly line balancing problem with the objective of minimizing the number of necessary work stations. This problem is denoted by TSALBP-1 in the literature. For tackling this problem we propose a Beam-ACO approach, which is an algorit...

متن کامل

Assembly line balancing to minimize balancing loss and system loss

Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...

متن کامل

Iterative Beam Search for Simple Assembly Line Balancing with a Fixed Number of Work Stations

The simple assembly line balancing problem (SALBP) concerns the assignment of tasks with pre-defined processing times to work stations that are arranged in a line. Hereby, precedence constraints between the tasks must be respected. The optimization goal of the SALBP-2 version of the problem concerns the minimization of the so-called cycle time, that is, the time in which the tasks of each work ...

متن کامل

On solving the assembly line worker assignment and balancing problem via beam search

Certain types of manufacturing processes can be modelled by assembly line balancing problems. In this work we deal with a specific assembly line balancing problem that is know as the assembly line worker assignment and balancing problem (ALWABP). This problem appears in settings where tasks must be assigned to workers, and workers to work stations. Task processing times are worker specific, and...

متن کامل

‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS

With the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can be very diverse, a balancing approach without simultaneously sequencing of models will not yield...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2005

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540412331320526