Stochastic generation scheduling with variable renewable generation: methods, applications, and future trends

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

splittable stochastic project scheduling with constrained renewable resource

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...

متن کامل

Scheduling security constraint unit commitment for power system including stochastic wind power generation

This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...

متن کامل

Generation scheduling in a competitive environment

Electric power restructuring offers a major change to the vertically integrated monopoly. The change manifests the main part of engineers’ efforts to reshape the three components of today’s vertically integrated monopoly: generation, distribution and transmission. In a restructured environment, the main tasks of these three components will remain the same as before, however, to comply with ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IET Generation, Transmission & Distribution

سال: 2019

ISSN: 1751-8695,1751-8695

DOI: 10.1049/iet-gtd.2018.6331