Passenger railway operations are based on an extensive planning process for generating the timetable, the rolling stock circulation, and the crew duties for train drivers and conductors. In particular, crew scheduling is a complex process. After the planning process has been completed, the plans are carried out in the real-time operations. Preferably, the plans are carried out as scheduled. How...
متن کاملAn exact decomposition approach for the optimal real-time train rescheduling problem
Trains are running through a rail network trying to meet a predened schedule, the Ocial Timetable, which species when each train enters and exists the stations on its route. When one or more trains deviate from the ocial timetable, new schedules and possibly new routes must be identied and implemented very quickly. Also, the new plan should minimize some measure of the delays. In a rst and very...
متن کاملEvaluation of an Integrated Real-Time Rescheduling and Train Control System for Heavily Used Areas
Capacity bottleneck areas in rail networks are especially prone to delays due to the high number of train interactions and therefore require special attention. Increasing demand for service requires that even more trains will be operated within these areas. Therefore, the production process in these bottleneck zones must be adapted to the new traffic demands. To achieve this goal, a combination...
متن کاملHeuristic Approach to Train Rescheduling
Starting from the defined network topology and the timetable assigned beforehand, the paper considers a train rescheduling in respond to disturbances that have occurred. Assuming that the train trips are jobs, which require the elements of infrastructure – resources, it was done by the mapping of the initial problem into a special case of job shop scheduling problem. In order to solve the given...
متن کاملReal-time energy-saving metro train rescheduling with primary delay identification
This paper aims to reschedule online metro trains in delay scenarios. A graph representation and a mixed integer programming model are proposed to formulate the optimization problem. The solution approach is a two-stage optimization method. In the first stage, based on a proposed train state graph and system analysis, the primary and flow-on delays are specifically analyzed and identified with ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Transport Development and Integration
سال: 2017
ISSN: 2058-8313,2058-8305
DOI: 10.2495/tdi-v1-n3-307-317