Structural Completeness of a Multi-Channel Linear System with Dependent Parameters

نویسندگان

چکیده

It is well known that the “fixed spectrum” (i.e., set of fixed modes) a multichannel linear system plays central role in stabilization such with decentralized control. A parameterized said to be “structurally complete” if it has no spectrum for almost all parameter values. Necessary and sufficient algebraic conditions are presented dependent parameters structurally complete. An equivalent graphical condition also given certain type parameterization.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

State Dependent Multi channel Queuing System with Ordered Entry

In the present study, we analyze the multi-channel service system with ordered entryfrom finite-source and finite-storage at each channel. The arrival and service rates are assumedto be state dependent. The steady state probabilities of the system are obtained by usingChapmann-Kolmogorov equations. Some other performance indices viz. utilization of servers,expected number of units in the system...

متن کامل

a structural survey of the polish posters

تصویرسازی قابلیتهای فراوانی را دارا است

15 صفحه اول

Pid Tuning for Multi-channel Structural Fatigue Testing System

A proportion-integration-differentiation (PID) controller is a generic control loop feedback mechanism widely used in multi-channel aircraft structural fatigue test. The PID parameter is obtained by test setup method in which PID is tuned after the test setup is actually performed, so that the tuning period becomes overlong. And the dynamic characteristic of mechanical and hydraulic equipment i...

متن کامل

A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Automatic Control

سال: 2021

ISSN: ['0018-9286', '1558-2523', '2334-3303']

DOI: https://doi.org/10.1109/tac.2021.3062327