In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملHybrid tabu search for re-entrant permutation flow-shop scheduling problem
The assumption of classical shop scheduling problems that each job visits each machine only once (Baker, 1974) is often violated in practice. A new type of manufacturing shop, the reentrant shop has recently attracted attention. The basic characteristic of a re-entrant shop is that a job visits certain machines more than once. For example, in semiconductor manufacturing, consequently, each wafe...
متن کاملA hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
This study considers the production environment of the re-entrant flow-shop (RFS). In a RFS, all jobs have the same routing over the machines of the shop and the same sequence is traversed several times to complete the jobs. The aim of this study is to minimize makespan by using the genetic algorithm (GA) to move from local optimal solution to near optimal solution for RFS scheduling problems. ...
متن کاملMulti-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop
The re-entrant flow shop scheduling problem (RFSP) is regarded as a NP-hard problem and attracted the attention of both researchers and industry. Current approach attempts to minimize the makespan of RFSP without considering the interdependency between the resource constraints and the re-entrant probability. This paper proposed Multi-level genetic algorithm (GA) by including the co-related reen...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
سال: 2013
ISSN: 0387-5024,1884-8354
DOI: 10.1299/kikaic.79.1112