Systematic Review of Cost Overrun Research in the Developed and Developing Countries

نویسندگان

چکیده

For decades, reputation of the construction industry has been tainted by poor cost performance caused project overrun. In addition, studies scholars worldwide have also found overrun to be more serious in developing countries compared developed countries. Despite numerous researches addressing issue through years, remains. Acknowledging that maintaining good is a key factor success and persisted for this study aims explore distinction conducted between nations nations. achieving aim, systematic literature review performed following integrative steps PSALSAR (Protocol, Search, Appraisal, Synthesis, Analysis Report) PRISMA (Preferred Reporting Items Systematic Reviews Meta-Analyses) screening selecting retrieved studies. The synthesis literatures yielded with 152 articles which are then classified into their countries, (44) (108). results indicated significant difference domain research on 2 nations, majority not directed any specific type while moved forward focus projects. highest attention transport infrastructure projects, particularly rail findings shown there broad both However, slight lacking comprehensiveness perhaps future can areas projects such as those researchers

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The cost of research in developing countries.

The terms ‘third world’ country and ‘developing’ or ‘underdeveloped’ country are common enough for most readers to have an idea of what I mean by such nations. Yet few readers from the richer parts of the world understand precisely what it means to live in a developing nation with low to median per-capita income, a small taxpayer base and low expenditures on social security, health and research...

متن کامل

Future competencies for hospital management in developing countries: Systematic review

    Background: This was a systematic review presenting the future competencies for hospital managers.     Methods: Participants, interventions, comparisons and outcomes (PICO) strategy with MeSH terms were used for searching. Databases used were Web of Science, PsycINFO and Medline, EBSCO, ScienceDirect, Emerald, ProQuest, Social Sciences Research Network, Embase, and some Iranian database su...

متن کامل

The Effects of Learning and Scale Economies in Health Sector: Case of Developed and Developing Countries

The quality and quantity of human capital are the most important factors in economic growth and its expansion depends on the educational and health infrastructure of countries. The education sector promotes the technical knowledge and skills of the human resources and the health sector provides its health; In addition, the quality of health services in turn is affected by education. Also, Learn...

متن کامل

Tourism Impact on Air Pollution in Developed and Developing Countries

T he main purpose of this paper is to investigate and compare the impact of tourism on air pollution in selected developed and developing countries during the period of 1995-2014. To this end, at first, the model was designed based on the Environmental Kuznets Curve (EKC) assumptions and with the presence of the major influencing factors on air pollution along with the international ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Sustainable Construction Engineering and Technology

سال: 2021

ISSN: ['2600-7959', '2180-3242']

DOI: https://doi.org/10.30880/ijscet.2021.12.01.020