Target alignment in the Shen-Guang II Upgrade laser facility
نویسندگان
چکیده
منابع مشابه
Bnl Accelerator Test Facility Control System Upgrade
Brookhaven National Laboratory’s Accelerator Test Facility (ATF) has embarked on a complete upgrade of its decade old computer system. The planned improvements affect every major component: processors (Intel Pentium replaces VAXes), operating system (Linux/Real-Time Linux supplants OpenVMS), and data acquisition equipment (fast Ethernet equipment replaces CAMAC serial highway.) This paper summa...
متن کاملHigh accuracy alignment facility for the receiver and transmitter of the BepiColombo Laser Altimeter.
The accurate co-alignment of the transmitter to the receiver of the BepiColombo Laser Altimeter is a challenging task for which an original alignment concept had to be developed. We present here the design, construction and testing of a large collimator facility built to fulfill the tight alignment requirements. We describe in detail the solution found to attenuate the high energy of the instru...
متن کاملMicron Size Laser-wire System at the Atf Extraction Line, Recent Results and Atf-ii Upgrade
The KEK Accelerator test facility (ATF) [1] extraction line laser-wire system has been upgraded last year allowing the measurement of micron scale transverse size electron beams. The most recent measurements using the upgraded system are presented. The ATF-II extraction line design [2] call for the major upgrade of the existing laser-wire system. We report on the hardware upgrades, including th...
متن کاملUPGRADE Vol. II, No. 5
Continuing technical advances will soon lead to an abundance of very small and very cheap microprocessors, which are equipped with sensors and have wireless communication capabilities. Information processing will then become ubiquitous and will permeate almost every type of object. We illustrate the vision of Mark Weiser, the visionary behind ubiquitous computing, and describe its technical fou...
متن کاملDØ Upgrade for RUN II
The DØ detector at The Fermilab Tevatron is undergoing a major upgrade to prepare for data taking with luminosities reaching 2× 10 cm s. The upgrade includes a new central tracking array, new muon detector components and electronic upgrades to many subsystems. The DØ upgraded detector will be operational for RUN II in spring 2000.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: High Power Laser Science and Engineering
سال: 2018
ISSN: 2095-4719,2052-3289
DOI: 10.1017/hpl.2018.4