Team Boundary Spanning in a Large Engineering Project

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Software Engineering Team Project - lessons learned

In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company) for its participants. The course was aimed to introduce issues regarding programm...

متن کامل

How Boundaries Spanning Enhances ISD Project Team Performance

Boundaries between project team and other units emerge when information system development project team is formed. Difficulties, during project execution, introduced by such boundaries highlight the importance of boundaries spanning for project team. On the other hand, previous studies have highlighted the critical role of social capital on performance, through enhancing acquisition, exchange, ...

متن کامل

Gasson – CAREER Proposal - Distributed Cooperation In Boundary-Spanning IS Design CAREER: DISTRIBUTED COOPERATION IN BOUNDARY-SPANNING IS DESIGN Project Summary

CAREER: DISTRIBUTED COOPERATION IN BOUNDARY-SPANNING IS DESIGN Project Summary The IT component of information system development has been radically simplified in recent years. Many corporations are now attempting to jointly design business processes and IT systems, to integrate workflows and information flows across business processes. The majority of these efforts fail, because there is a fun...

متن کامل

Boundary spanning in the context of academic education

Despite the emergence of the concept of boundary spanning in the fields of behavioral psychology and organization theories, this concept is still somewhat unknown in the health and medical education system. Meanwhile, one of the approaches and activities that can help to improve the health and medical education system is boundary spanning activities. Thus, boundary spanning is considered as a v...

متن کامل

Boundary Spanning and the Differentiated Effects of IS Project Deviations

In environments where risk planning does not eliminate disruptions, advancing risk management requires an improved understating of the relationships among different types of deviations. This empirical study of IT professionals in a single organization differentiates requirements fluctuations, staff fluctuations and technology fluctuations to reveal distinct performance effects from challenges e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Small Group Research

سال: 2020

ISSN: 1046-4964,1552-8278

DOI: 10.1177/1046496420976836