The aperiodic facility layout problem with time-varying demands and an optimal master-slave solution approach
نویسندگان
چکیده
منابع مشابه
Optimal design of cross docking supply chain networks with time-varying uncertain demands
This paper proposes an integrated network design model for a post-distribution cross-docking strategy, comprising multi product production facilities with shared production resources, capacitated cross docks with setup cost and customer zones with time windows constraints. The model is dynamic in terms of time-varying uncertain demands, whereas uncertainty is expressed with scenario approach an...
متن کاملThe Joint Replenishment Problem with Time-Varying Costs and Demands: Efficient, Asymptotic and ε-Optimal Solutions
We address the Joint Replenishment Problem (JRP) where, in the presence of joint setup costs, dynamic lot sizing schedules need to be determined for m items over a planning horizon of N periods, with general time-varying cost and demand parameters. We develop a new, so-called, partitioning heuristic for this problem, which partitions the complete horizon of N periods into several relatively sma...
متن کاملA solution to the facility layout problem using simulated annealing
Ž . In this paper a solution in the continual plane to the Facility Layout Problem FLP is presented. It is based on Simulated Ž . Annealing SA , a relatively recent algorithm for solving hard combinatorial optimization problems, like FLP. This approach Ž . may be applied either in General Facility Layout Problems GFLP considering facilities areas, shapes and orientations or in Ž . Machine Layou...
متن کاملCompetitive Vehicle Routing Problem with Time Windows and Stochastic Demands
The competitive vehicle routing problem is one of the important issues in transportation area. In this paper a new method for competitive VRP with time windows and stochastic demand is introduced. In the presented method a three time bounds are given and the probability of arrival time between each time bound is assumed to be uniform. The demands of each customer are different in each time wind...
متن کاملStochastic Facility Layout Planning Problem: A Metaheuristic and Case Study
Facility layout is one of the most important Operations Management problems due to its direct impact on the financial performance of both private and public firms. Facility layout problem (FLP) with stochastic parameters, unequal area facilities, and grid system modeling is named GSUA-STFLP. This problem has not been worked in the literature so that to solve GSUA-STFLP is our main contribution....
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2020
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207543.2020.1775909