The vast majority of project scheduling efforts assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. In reality, however, project activities are subject to considerable uncertainty, which generally leads to numerous schedule disruptions. It is of interest to develop pre-sche...
متن کاملHeuristic procedures for generating stable project baseline schedules
Solution robust project scheduling is a growing research field aiming at constructing proactive schedules to cope with multiple disruptions during project execution. When stochastic activity durations are considered, including time buffers between activities is a proven method to improve the stability of a baseline schedule. This paper introduces multiple algorithms to include time buffers in a...
متن کاملconstruction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers
the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...
a study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2004
ISSN: 0377-2217
DOI: 10.1016/s0377-2217(03)00130-9