THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

lot sizing with rework and different inspection costs

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return

This study examines an imperfect production and inspection system with customer return and defective disposal. We develop an optimal lot sizing model with production and inspection quality investment, incorporating all the quality costs. We find the optimal lot size, rework frequency, defective proportion, and Type I and Type II inspection error proportions which minimize the total quality cost...

متن کامل

Integrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time

This research is derived an integrated model of economic production quantity, inspection and preventive maintenance to incorporate rework, minimal repair and inspection time for an imperfect production system. Some proportions of non-conforming items are assumed scrap before the rework process start and others are reworked. The rework process is imperfect that is a proportion of the reworked it...

متن کامل

The economic production lot-sizing problem with imperfect production processes and imperfect maintenance

This paper deals with an integrated model for the joint determination of economic production quantity and preventive maintenance (PM) level for an imperfect process having a general deterioration distribution with increasing hazard rate. The effect of PM activities on the deterioration pattern of the process is modeled using the imperfect maintenance concept. It is assumed that, after each PM, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Marmara Business Review

سال: 2019

ISSN: 2630-6255

DOI: 10.35333/jrb.2019.56