The Discussion of 500kv Centralized Monitoring System For Large Operation and Large Maintenance Mode
نویسندگان
چکیده
منابع مشابه
CONSTRAINED BIG BANG-BIG CRUNCH ALGORITHM FOR OPTIMAL SOLUTION OF LARGE SCALE RESERVOIR OPERATION PROBLEM
A constrained version of the Big Bang-Big Crunch algorithm for the efficient solution of the optimal reservoir operation problems is proposed in this paper. Big Bang-Big Crunch (BB-BC) algorithm is a new meta-heuristic population-based algorithm that relies on one of the theories of the evolution of universe namely, the Big Bang and Big Crunch theory. An improved formulation of the algorithm na...
متن کاملEvaluation of Close-Range Photogrammetric Technique for Deformation Monitoring of Large-Scale Structures: A review
Close-range photogrammetry has been used in many applications in recent decades in various fields such as industry, cultural heritage, medicine and civil engineering. As an important tool for displacement measurement and deformation monitoring, close-range photogrammetry has generally been employed in industrial plants, quality control and accidents. Although close-range photogrammetric applica...
متن کاملLaws of Large Numbers for Random Linear
The computational solution of large scale linear programming problems contains various difficulties. One of the difficulties is to ensure numerical stability. There is another difficulty of a different nature, namely the original data, contains errors as well. In this paper, we show that the effect of the random errors in the original data has a diminishing tendency for the optimal value as the...
متن کاملEnergy Consumption Monitoring System for Large Complexes
This paper describes the development of an open source system for monitoring and data acquisition of several energy analyzers. The developed system is based on a computer with Internet/Intranet connection by means of RS485 using Modbus RTU as communication protocol. The monitoring/metering system was developed for large building complexes and was validated in the Faculdade de Ciências e Tecnolo...
متن کاملAn Innovative Inductive Air-gap Monitoring System for Large Low Speed Hydro-generators, Tests in Operation
Large low speed hydro-generators (fig. 1) have a very small specific air-gap to stator bore diameter ratio making it virtually impossible to have a perfect centering of the rotor within the stator during the assembly process. Therefore the machines are operated with an eccentricity that, though small, is not negligible, and is the cause of undesirable effects: considerable unbalanced magnetic p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering
سال: 2013
ISSN: 1947-3931,1947-394X
DOI: 10.4236/eng.2013.51b023