The multi-objective assembly line worker integration and balancing problem of type-2

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assembly Line Worker Integration and Balancing Problem

We propose the Assembly Line Worker Integration and Balancing Problem (ALWIBP), a new assembly line balancing problem arising in lines with conventional and disabled workers. The goal of this problem is to maintain high productivity levels by minimizing the number of workstations needed to reach a given output, while including in the assembly line a number of disabled workers. This problem gain...

متن کامل

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach

Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...

متن کامل

Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing

This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...

متن کامل

Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations

This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Operations Research

سال: 2017

ISSN: 0305-0548

DOI: 10.1016/j.cor.2017.01.003