The NSCL cyclotron gas stopper – Entering commissioning

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commissioning of the Coupled Cyclotron Facility at Nscl *

The Coupled Cyclotron Facility at Michigan State University is being completed with the experimental program scheduled to start in July 2001. First beam through the paired cyclotrons was obtained on 10 October 2000.

متن کامل

The Nscl Coupled Cyclotron Project - Overview and Status

The present nuclear physics program at the National Superconducting Cyclotron Laboratory (NSCL) is based on an ECR-ion-source injected K1200 superconducting cyclotron. An upgrade project is now underway to significantly increase the facility’s output intensity for light ions and energy for heavy ions by coupling the existing superconducting K500 cyclotron to the K1200. The improved acceleration...

متن کامل

Construction of a Gas Stopping Station at the Nscl

Measurements on nuclei far from stability can and will continue to provide the most stringent tests of nuclear theories. Detailed measurements of masses, half-lives, and decay processes will be possible with thermalized beams of ions from the NSCL s Coupled Cyclotron. Even the most exotic nuclei can be studied if the thermalization and subsequent extraction are rapid (~10 ms). For example, the ...

متن کامل

Noname manuscript No. (will be inserted by the editor)

Gas stopping is becoming the method of choice for converting beams of rare isotopes obtained via projectile fragmentation and in-flight separation into low-energy beams. These beams allow ISOL-type experiments , such as mass measurements with traps or laser spectroscopy, to be performed with projectile fragmentation products. Current gas stopper systems for high-energy beams are based on linear...

متن کامل

Summary of the Nscl Control System

100base-T Ethernet is used to connect the major control system components (VME crates, PLCs and operator workstations) with each other. VME crates and PLCs are connected to a pair of 24-port Ethernet switches, which will become part of an isolated Ethernet segment once an upcoming network upgrade is completed. Primary operator workstations will also be connected to this segment, and routers ins...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms

سال: 2016

ISSN: 0168-583X

DOI: 10.1016/j.nimb.2015.12.035