The permutation flow shop problem with sum-of-completion times performance criterion

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Multi-objective Permutation Flow Shop Scheduling Problem with Fuzzy Processing Times under Learning and Aging Effects

In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it is assumed that each machine may be subject to at most one maintenance activity during the planning horizon. The objec...

متن کامل

Solving the Permutation Flow Shop Problem with Makespan Criterion using Grids

The optimization of scheduling problems is based on different criteria to optimize. One of the most important criteria is the minimization of completion time of the last task on the last machine called makespan. In this paper, we present a parallel algorithm for solving the permutation flow shop problem. Our algorithm is a basic parallel distributed algorithm deployed in a grid of computer (Gri...

متن کامل

A tabu search for the permutation flow shop problem with sequence dependent setup times

In this work we present a metaheuristic method based on tabu search for solving the permutation flow shop scheduling problem with sequence dependent setup times, with the objective of minimizing total weighted tardiness. The problem is well known for its practical applications and for the difficulty in obtaining good solutions. The tabu search method proposed is based on the insertion neighborh...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

The Constrained Minimum Weighted Sum of Job Completion Times Problem

We consider the problem of minimizing the weighted sum of job completion times on a single machine (subject to certain job weights) with an additional side constraint on the weighted sum of job completion times (with respect to different job weights). This problem is NP-hard, and we provide a polynomial time approximation scheme for this problem. Our method is based on Lagrangian relaxation mix...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Naval Research Logistics

سال: 1993

ISSN: 0894-069X,1520-6750

DOI: 10.1002/1520-6750(199310)40:6<843::aid-nav3220400608>3.0.co;2-a