Three-Dimensional Collision Avoidance Control Law for Aircraft Using Risk Function and Fuzzy Logic

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Based Aircraft Collision Avoidance System

As new aircrafts are inducted into the fleets of commercial airliners the vast airspace is becoming congested on certain routes and commercial hubs. Midair collision risks are increasing with the growth in air traffic volume and therefore; for the sake of safety aircrafts must be technically adept of monitoring the airspace and divert from a predetermined route, when traffic or weather conditio...

متن کامل

Fuzzy logic based collision avoidance for a mobile robot

Navigation and collision avoidance are major areas of research in mobile robotics that involve varying degrees of uncertainty. In general, the problem consists of achieving sensor based motion control of a mobile robot among obstacles in structured and/or unstructured environments with collision-free motion as the priority. A fuzzy logic based intelligent control strategy has been developed her...

متن کامل

Fuzzy Logic Control for Aircraft Longitudinal Motion

i Proclamation ii Acknowledgement iii Table of

متن کامل

Collision Avoidance for Unmanned Aircraft using Markov Decision Processes

Before unmanned aircraft can fly safely in civil airspace, robust airborne collision avoidance systems must be developed. Instead of hand-crafting a collision avoidance algorithm for every combination of sensor and aircraft configuration, we investigate the automatic generation of collision avoidance algorithms given models of aircraft dynamics, sensor performance, and intruder behavior. By for...

متن کامل

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY FOR AERONAUTICAL AND SPACE SCIENCES

سال: 2004

ISSN: 0549-3811

DOI: 10.2322/tjsass.46.253