Throughput and Delay Analysis of Database Replication Algorithm
نویسندگان
چکیده
منابع مشابه
Analysis of Database Replication Algorithm in Local and Global Networks
In this paper, a database replication algorithm is presented. The main idea is to reduce the latency in database replication while maintaining very high throughput. The main points of the algorithm are detailed in this paper. Simulation results are presented to evaluate throughput and average delay. For the in-depth analysis of the algorithm, various cases are considered and it has been found t...
متن کاملTheoretical Analysis of GPRS Throughput and Delay
We present a theoretical analysis of the radio link control layer and media access control layer of the General Packet Radio Service, a packet data overlay of GSM. The analysis focuses on the effects of retransmissions on the throughput of an uplink Packet Data Traffic Channel. We are especially interested in the relative throughput of the four GPRS coding schemes. We find in addition to channe...
متن کاملlangauge needs analysis of undergraduate business management and economics students
the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...
15 صفحه اولa phonological contrastive analysis of kurdish and english
deposite the different criticisms on contrastive analysis it has been proved that the results of it(when processed)can be usuful in a tefl environment,specially at the level of phonology.this study is an attempt to compare and contrast the sound systems of kurdish and english for pedagogical aims. the consonants,vowels,stress and intonation of the twolanguages are described by the same model-ta...
15 صفحه اولthe stady and analysis of rice agroclimatology in lenjan
the west of esfahan province, iran, is one of the most important agricultural areas throughout the country due to the climate variability and life-giving water of zayanderood river. rice is one of the major and economic crops in this area. the most important climatic elements in agricultural activities which should be considered include temperature, relative humidity, precipitation and wind. so...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Modern Education and Computer Science
سال: 2013
ISSN: 2075-0161,2075-017X
DOI: 10.5815/ijmecs.2013.12.07