Throughput-Delay Analysis of Random Linear Network Coding for Wireless Broadcasting

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Wireless Broadcasting With Network Coding

Wireless digital broadcasting applications such as digital audio broadcast (DAB) and digital video broadcast (DVB) are becoming increasingly popular since the digital format allows for quality improvements as compared to traditional analogue broadcast. The broadcasting is commonly based on packet transmission. In this thesis, we consider broadcasting over packet erasure channels. To achieve rel...

متن کامل

Wireless Broadcasting Using Network Coding

Traditional approaches to transmit information reliably over an error-prone network employ either Forward Error Correction (FEC) or retransmission techniques. In this paper we consider an application of network coding to increase the bandwidth efficiency of reliable broadcast in a wireless network. In particular, we propose two schemes which employ network coding to reduce the number of retrans...

متن کامل

Instantly Decodable versus Random Linear Network Coding: A Comparative Framework for Throughput and Decoding Delay Performance

This paper studies the tension between throughput and decoding delay performance of two widely-used network coding schemes: random linear network coding (RLNC) and instantly decodable network coding (IDNC). A single-hop broadcasting system model is considered that aims to deliver a block of packets to all receivers in the presence of packet erasures. For a fair and analytically tractable compar...

متن کامل

Delay Optimal Scheduling for Chunked Random Linear Network Coding Broadcast

We study the broadcast transmission of a single file to an arbitrary number of receivers using Random Linear Network Coding (RLNC) in a network with unreliable channels. Due to the increased computational complexity of the decoding process (especially for large files) we apply chunked RLNC (i.e. RLNC is applied within non-overlapping subsets of the file). In our work we show the optimality of t...

متن کامل

Practical throughput analysis for two-hop wireless network coding

Network coding (NC) has been regarded as a promising technology for throughput improvement in wireless networks, so a thorough understanding on the possible throughput gain from using NC is essential for the application of such technology. Available studies of throughput gain from NC, which mainly focus on only coding sub-layer or both MAC layer and coding sub-layer but largely neglect the prim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Information Theory

سال: 2013

ISSN: 0018-9448,1557-9654

DOI: 10.1109/tit.2013.2271895