Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi Objective Particle Swarm Optimization for a Discrete Time, Cost and Quality Trade -off Problem

Time -Cost trade-off is a known and important problem in project management, because project managers should decide that whether they want to shorten the time of a project and tolerate its execution costs or minimize the costs and accept delays. It was recently suggested that the quality of a project should also be taken into considerations in this decision-making. In this paper, a meta-heurist...

متن کامل

Pareto Oriented Optimization of Discrete Time-cost Trade-off Problem Using Particle Swarm Optimization

In project scheduling, it is feasible to reduce the duration of a project by allocating additional resources to its activities. However, crashing the project schedule will impose additional costs. Numerous research has focused on optimizing the trade-off between time and cost to achieve a set of non-dominated solutions. However, the majority of the research on time-cost trade-off problem develo...

متن کامل

SELECTION OF SUITABLE RECORDS FOR NONLINEAR ANALYSIS USING GENETIC ALGORITHM (GA) AND PARTICLE SWARM OPTIMIZATION (PSO)

This paper presents a suitable and quick way to choose earthquake records in non-linear dynamic analysis using optimization methods. In addition, these earthquake records are scaled. Therefore, structural responses of three different soil-frame models were examined, the change in maximum displacement of roof was analyzed and the damage index of whole structures was measured. The soil classifica...

متن کامل

A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...

متن کامل

Multi-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm

Time and cost are among the important aspects considered for every construction project. Many research approaches have been followed to model time-cost relationship. There is a constant rise in the use of innovative contract methods which provide incentives for maximizing quality. There is an increasing pressure to improve the project performance due to the innovative contracting methods which ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Civil Engineering Journal

سال: 2019

ISSN: 2476-3055,2676-6957

DOI: 10.28991/cej-2019-03091424