Time Delay Analysis of Rajapeth Cross over Bridge

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite time stabilization of time-delay nonlinear systems with uncertainty and time-varying delay

In this paper, the problem of finite-time stability and finite-time stabilization for a specific class of dynamical systems with nonlinear functions in the presence time-varying delay and norm-bounded uncertainty terms is investigated. Nonlinear functions are considered to satisfy the Lipchitz conditions. At first, sufficient conditions to guarantee the finite-time stability for time-delay nonl...

متن کامل

CAD Modeling of Coplanar Waveguide Cross-Over Air-Bridge

In this article, a new CAD model for the coplanar waveguide (CPW) cross-over air-bridge is proposed. The model takes into account the CPW open-end capacitance and the vertical strips of the bridge. The section directly underneath the bridge is modeled as a small section of a microstrip line. Our results are in good agreement with the published full-wave results. © 2005 Wiley Periodicals, Inc. I...

متن کامل

Delay analysis of fMRI time

The high temporal resolution of fMRI allows to supplement the spatial analysis of the hemodynamic response to focal neuronal activation with a study of the temporal response in each region. Signal processing and time series analysis provide a number of tools for achieving this goal. This contribution suggests to apply a novel modelling technique to fMRI time series in order to estimate the temp...

متن کامل

Time Delay Estimation via Multichannel Cross-correlation

Time delay estimation (TDE) in a reverberant acoustical environment is a very challenging and difficult problem. This paper tackles the problem by exploiting the redundant information provided by multiple microphone sensors. To do so, the multichannel crosscorrelation coefficient (MCCC) is re-derived, in a new way, to connect it to the well-known linear interpolation technique. Some interesting...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology

سال: 2019

ISSN: 2321-9653

DOI: 10.22214/ijraset.2019.4614