TISEM: A Two-Stage Interval-Stochastic Evacuation Management Model

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A two-stage mathematical model for evacuation planning and relief logistics in a response phase

Crises and natural disasters are always existed in human history, and continue to exist in the future; therefore, people are always affected by these natural disasters. Hence, evacuation planning after natural disasters (e.g., earthquakes, floods, tsunamis, fire, storms, warfare and nuclear explosions) is vital. Given that natural disasters cause irreparable financial loss and the loss of life ...

متن کامل

A two-stage stochastic rule-based model to determine pre-assembly buffer content

This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage of the model decide...

متن کامل

Reconfiguration of Supply Chain: A Two Stage Stochastic Programming

In this paper, we propose an extended relocation model for warehouses configuration in a supply chain network, in which uncertainty is associated to operational costs, production capacity and demands whereas, existing researches in this area are often restricted to deterministic environments. In real cases, we usually deal with stochastic parameters and this point justifies why the relocation m...

متن کامل

A Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design

Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Environmental Informatics

سال: 2008

ISSN: 1726-2135,1684-8799

DOI: 10.3808/jei.200800125