Towards an AoA-Free Courseware for the Critical Path Method

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards an Operational Definition of Critical Thinking

This paper offers a state-of-the-art working definition for the concept of Critical Thinking (CT hereafter) in an attempt to provide a framework for the development of an operational definition for this complex concept. Having studied various definitions and models, proposed for CT by major figures in the field, the key defining features of this rich concept were identified and classified. Base...

متن کامل

Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...

متن کامل

An Integrated Courseware Usability Evaluation Method

e-Learning is expected to support organizations in being more adaptable and competitive. However, current results do not measure up business and individual expectations yet. We propose a holistic framework focused on e-learning outcomes and their articulation with business process, courseware and learners’ individual characteristics. In this e-learning framework, courseware usability is analyze...

متن کامل

Proposing an Efficient Software-Based Method for Enhancing the Reliability of Critical Application Robot

Robots play such remarkable roles in humans’ modern lives that performing many tasks without them isimpossible. Using robotic systems is gradually increasing the tasks allocated to them and they are becomingmore complex and critical. Software reliability is one of the most significant requirements of robots. Forenhancing reliability, systems should be inherently designed to be tolerable of soft...

متن کامل

A Critical Look at the Path Towards Truly Personalized Games

Over the last few decades, games have evolved from a very scripted experience where the player plays a passive role in experiencing the author's unfolding story to a collaborative effort between the player and the author to tell a shared story. Current research in interactive narrative continues to push the envelope to give the player more and more control over the outcome of the story. The ide...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: INFORMS Transactions on Education

سال: 2005

ISSN: 1532-0545,1532-0545

DOI: 10.1287/ited.5.2.47