Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
نویسندگان
چکیده
منابع مشابه
Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملStochastic Resource-constrained Project Scheduling
PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...
متن کاملsplittable stochastic project scheduling with constrained renewable resource
this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...
متن کاملApproaches to Efficient Resource-Constrained Project Rescheduling
The intrinsic and pervasive uncertainty of the real world causes unforeseen disturbances during the execution of plans. The continuous adaptation of existing schedules is necessary in response to the corresponding disruptions. Affected Operations Rescheduling (AOR) and Matchup Scheduling (MUP) have proven to be efficient techniques for this purpose, as they take only a subset of future activiti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of information and organizational sciences
سال: 2018
ISSN: 1846-9418,1846-3312
DOI: 10.31341/jios.42.2.2